University Borescopic Inspection 

June 13, 2023

Investigated “musty/moldy” odor in Administrative Building/Science Building. Provided videotaped and narrative description of internal inspection of the HVAC system, including ductwork, coils, blower section, air handling unit, and squirrel cage. Recommendations for remediation were implemented.

Other projects

Rooftop System Replacement

Rooftop System Replacement

Time for a system upgrade! Our client's facility needed help with its outdated HVAC system. The existing split system...

Church Classroom HVAC Retrofit

Designed and installed a new HVAC system in an existing sanctuary that was being converted into two floors of...